How is a paver walkway built?

Like a long, narrow patio. A walk takes the same CMHA minimum as any foot-traffic paving, 4 compacted inches of crushed stone over firm, well-drained soil, then an inch of loose bedding sand and the pavers. The difference is the edges. A 4-foot path has two long borders for every few feet of surface, and the edge restraint is what keeps the units from creeping into the lawn.

Where should the water go?

Off to the side. A path running downhill toward the house collects water from everything above it. Pitching the surface sideways at CMHA’s 1.5 percent minimum sends rain into the bed beside it, and on a long slope a step or a cross-drain breaks the run.

Steps on a sloped lot

Many Nashville lots fall from the street to the front door or from the back door to the yard. Steps can be solid block treads, stacked stone slabs, or pavers over a block riser, set into the slope and tied into the walls beside them. Every riser in a run should match; a foot learns the first step and catches on the one that’s different. Lights on the treads help most after dark.

Paver, brick or flagstone?

Pavers give straight lines and an even surface for a stroller or a wheelbarrow. Clay brick suits an older house with brick already on it. Flagstone, irregular slabs of sandstone or limestone, can be dry-laid in gravel for a garden path or mortared onto a concrete slab where it has to stay put.

Before the digging starts

Gas, water, power and cable lines often cross under a front walk. Under Tennessee’s dig law a ticket has to go to Tennessee 811 three working days or more before excavation begins, and the marks it produces are good for 15 calendar days, so the call is timed to the dig date.

Sources

Answers

Walkways & Steps: questions people ask

How do you build steps into a slope?

Cut the slope into level landings, set each step on compacted stone, and tie the steps into walls or edging at their sides so they can’t creep downhill. Treads can be solid block, stone slabs or pavers over a block riser. Keep every riser in the run the same height.

What is the best material for a front walkway?

The one that matches the house and stays flat. Pavers give a smooth, even surface for strollers and wheelbarrows, clay brick suits a brick house, and flagstone fits a garden path. All three last when they sit on at least 4 inches of compacted stone with an edge restraint along both sides.

Do I need to call 811 before building a walkway?

Yes. Tennessee requires notice to 811 at least three working days before any excavation, and a front walk often crosses gas, water and cable lines on the way to the street. The locate marks stay valid for 15 calendar days, so time the call to the dig.

Why do walkway pavers sink or spread?

A thin base or no edge restraint. Pavers settle where the stone under them wasn’t compacted or where water pools, and they creep sideways where nothing holds the border. A walk built on at least 4 inches of compacted stone, pitched to drain, with restraint along both edges stays put.

Can lights be added to a walkway?

Yes, and the cheapest time is while the walk is built. Low-voltage cable runs beside the path before the edging goes in, and path or step lights go where the walk turns or changes level. Adding them later means lifting pavers or trenching along a finished edge.

Request an Estimate

Start with the yard

Where the path starts and ends, and how much the ground falls between.

Where your message goes and what the site keeps: our privacy policy.

Email Request an Estimate